Utility-scale and C&I solar plants that out-perform their PVsyst model — through bankable design, audited construction, and predictive O&M from the same team that built them.
Capabilities
From single-axis tracker farms in Rajasthan to floating solar on Gujarat reservoirs — we choose the topology that matches the site, not the sales pitch.
50 MW – 1 GW single-axis tracker plants with bifacial TOPCon modules and central or string inverter topologies.
100 kW – 5 MW rooftop systems for industrial loads — net metering, OPEX/CAPEX models, structural surveys included.
Reservoir and tailings-pond installations — HDPE float systems, mooring engineering and aquatic-impact studies.
DC-coupled BESS for shifted dispatch, peak shaving and grid-firming — single SCADA, single contract, single throat to choke.
How we work
No hand-offs to sub-contractors mid-project. The senior engineer who quotes your plant is the same person who signs the commissioning report.
Site survey, PVsyst modelling, single-line diagrams, financial pro-forma. 2–4 weeks.
Detailed engineering, equipment specification, vendor selection and material logistics. 6–10 weeks.
Civil, mechanical and electrical works under one project director. CEA-compliant testing and grid sync. 4–9 months.
Remote SCADA monitoring, predictive maintenance, module washing and performance reporting. 25 years.
Designed, built and commissioned in 11 months under a single EPC contract — exceeding the modelled performance ratio in its first year of operation.
Send your land details, target capacity and grid-connection point — we'll return a no-obligation feasibility outline within 48 hours.